Transform Your Land into Renewable Energy

Partner with Legacy Energy to develop large-scale solar farms that generate revenue while supporting a sustainable future. From 5 acres to 1,000+ acres, we handle the entire process.

Passive Income

Earn $1,000–$2,500 per acre per year in lease income — with zero operational effort required from you.

Environmental Impact

Contribute directly to clean energy generation, reducing carbon emissions for thousands of homes and businesses.

Professional Management

Our experienced team handles all operations, maintenance, regulatory compliance, and grid interconnection.

Tax Incentives & Carbon Credits

Access federal ITC, accelerated depreciation, and carbon credit revenue of $10,000–$50,000+ per year per 100 acres.

Dual-Use Options

Agrivoltaic designs allow compatible farming or grazing to continue beneath and between solar panels, preserving agricultural use.

Dedicated Support

25-year warranty with a dedicated account manager and 24/7 monitoring to protect your investment for decades.
Our Partners

Real returns on your land

Legacy Energy solar farm partnerships deliver stable, long-term income streams with multiple revenue channels.

$1k–$2.5k

Per Acre Per Year
Ownership income through lease agreements with Legacy Energy or utility partners.

$10k–$50k+

Carbon Credits Annually
Per 100 acres of solar capacity — additional income on top of your base lease payments.

25-Year

PPA Guaranteed Income
Power Purchase Agreements lock in stable, predictable income for a quarter century.
The Process

Our Development Process

A structured, transparent process from first contact to long-term operations — we handle every step so you don't have to.

Initial Assessment

2–4 Weeks
We evaluate your parcel for solar suitability — acreage, solar irradiance, topography, grid proximity, and land-use constraints.

Design & Engineering

4–8 Weeks
Our engineering team designs a custom solar layout optimized for maximum energy yield and minimal environmental impact.

Permitting & Interconnection

3–6 Months
We manage all local permits, utility agreements, and grid interconnection studies and approvals on your behalf.

Construction

3–6 Months
Our certified construction crews build your solar farm using industry-leading equipment with minimal site disruption.

Inspection & Activation

2–4 Weeks
Final inspections, utility commissioning, and system activation. Your farm is online and generating income.

Monitoring & Maintenance

Ongoing
24/7 remote monitoring, preventive maintenance, and quarterly performance reports delivered to your inbox.

Land assessment checklist

Use this checklist to get a quick sense of your land's solar development potential. Our team will conduct a thorough assessment at no cost.

Basic Parcel info

  • 10+ acres of contiguous land
  • Clear title with no liens or encumbrances
  • Road access to ability to create access
  • No active oil, gas, or mineral leases

Physical Site

  • Relatively flat terrain (slope<5%)
  • Minimal shading from trees or structures
  • Suitable soil for ground mounting
  • No significant flood zone concerns

Grid & Interconnection

  • Electrical substation within 2-3 miles
  • Transmission lines near or on property
  • Utility willing to accept new interconnection

Legal, Financial & Community

  • Zoning permits utility-scale solar
  • ITC and tax incentive eligible
  • No pending legal disputes on property
  • Community support or neutral stance

Projects across
residential, commercial
& utility scale

From 8kW rooftop systems to 78MW utility farms — Legacy Energy manages a diversified portfolio of clean energy assets across 42 states, generating consistent returns for our investment partners.

25-Acre Utility-Scale Solar Farm

78MW   |  New Mexico
40 MWh battery storage - 25yr utility PPA - $2.1M annual revenue

Utility-Scale Solar Farm

367.5MW  |  Houston, Texas
Seeking PPA partner - equity co-investment

Solar + Battery Storage

18 projects   |  Oahu, Maui, Kauai & Hawaii Island
$67.8M portfolio - 100% contracted under Hawaiian Electric PPAs

Project Sol

500 MWp  |  Southern Portugal
420 MW grid connection secured with REN - TRB target 2027
State incentive

Find out how your state is qualified for incentive

Maximize your savings with state tax credits, rebates, property tax exemptions, and net metering programs. Updated June 2026.
Contact Us

Get Your Free
Home Assessment

Our experts will analyze your home's energy usage, roof conditions, and local incentives to design the perfect solar solution — at no cost and with no obligation.